|
|
|
|
|
|
|
Highway Products Project Gallery
I-90, Albany, NY

A total of 378 slabs, (some are visible above) were placed on this two mile rehabilitation project on I-90 in Albany, N.Y. in 47 night closures. A value engineering proposal utilizing the Super-Slab® System, initiated by the contractor, resulted in the repairs being made in about half the time when compared to the specified rapid set concrete method. The entire six lane highway was open during the hours of heavy traffic volumeevery day..
|
|
|
Specialized grading equipment, shown below, was used to provide an accurate subgrade surface. This facilitated rapid slab placement and allowed opening the slabs to traffic before they were grouted, enabling the contractor to use the entire work window for slab replacement work. After all of the repairs were made the pavement was overlayed with asphalt concrete.
Owner
New York State Department of
Transportation, Region 1
Contractor
Fahs Rolston Paving Corporation
Engineer
New York State Department of
Transportation, Region 1
|
|
|
|
|

© 2006 The Fort Miller Co., Inc. All rights reserved.
|
|
|
|
|
|
|
Project Gallery:
Retaining Walls
Bridge Products
Highway Products
Route 7 Crosstown Plaza,
Schenectady, NY
I-95 Pavement Repairs,
New York, NY
Route 112 Precast Crosswalks
Port Jefferson, NY
Trunk Highway 62 Precast Repairs
Minneapolis, MN
Tappan Zee Bridge Toll Plaza, Tarrytown, NY
Washington Dulles International,
Washington, D.C.
Lincoln Tunnel, NJ
I-90, Albany, NY
Hutchinson River Parkway, Rye Brook, NY
Newburgh Beacon Bridge approach I-84, Newburgh, NY
Marine Parkway Bridge Toll Plaza, Brooklyn, NY
Route 86 Wilmington Notch
Towns of North Elba and Wilmington, NY
Custom Structures
|
|
|
|
|
|
|
|
|