The Fort Miller Co., Inc.

P.O. Box 98
Schuylerville, NY 12871

Tel: (518) 695-5000
Fax: (518) 695-4970

www.fortmiller.com

Prefabricated Bridge Units

 


 

Formerly known as Inverset, Prefabricated Bridge Units, offer the owner a durable, high quality product and the contractor a rapid method of installation with minimal disruption to the traveling public.

Fort Miller has produced spans up to 126’ long with skews in excess of 45 degrees. Bridge units are typically placed on traditional bearings and in some cases on bearing pads.  Each bridge is custom designed and manufactured to meet site specific conditions.

By incorporating precast concrete piers, abutments, pedestals, barrier and approach slabs into the bridge project the entire structure can be completed overnight or over-the-weekend.

Our Prefabricated Bridge Units brochure is available for download:

PDF Version: Prefabricated Bridge Units



© 2006 The Fort Miller Co., Inc. All rights reserved.