The first of (975) precast concrete bridge deck panels have been installed by Tappan Zee Constructors on the Main Span portion of The New NY Bridge (the new Tappan Zee Bridge). The new 3+ mile
Continue ReadingJune 28, 2016

Fort Miller’s Precast Concrete Bridge Deck Panels Installed on Main Span of the New NY Bridge (Tappan Zee Bridge)
by Josh French |
in Uncategorized |
Comments Off on Fort Miller’s Precast Concrete Bridge Deck Panels Installed on Main Span of the New NY Bridge (Tappan Zee Bridge)