518.695.5000
P.O. Box 98
Schuylerville, NY 12871

Monthly Archives June 2016

June 28, 2016

Fort Miller’s Precast Concrete Bridge Deck Panels Installed on Main Span of the New NY Bridge (Tappan Zee Bridge)

by Josh French  |   in Uncategorized  |   Comments Off on Fort Miller’s Precast Concrete Bridge Deck Panels Installed on Main Span of the New NY Bridge (Tappan Zee Bridge)

The first of (975) precast concrete bridge deck panels have been installed by Tappan Zee Constructors on the Main Span portion of The New NY Bridge (the new Tappan Zee Bridge). The new 3+ mile

Continue Reading