A total of (4) prefabricated bridge units (PBUs) and (8) precast concrete approach slabs were recently installed on CT Route 4 over West Branch Leadmine Brook in the town of Harwinton, Connecticut. These 45-ton units
Continue ReadingNovember 01, 2016

Fort Miller’s Prefabricated Bridge Units Installed in Harwinton (Litchfield County), Connecticut
by Josh French |
in Uncategorized |
Comments Off on Fort Miller’s Prefabricated Bridge Units Installed in Harwinton (Litchfield County), Connecticut