On the night of February 18th 2022, our 53-ft long prefabricated bridge unit fabricated in our Easton, NY manufacturing facility was installed by SPS New England (Salisbury, MA) at the MBTA Beverly Station over Pleasant Street in Beverly, MA.

February 21, 2022
On the night of February 18th 2022, our 53-ft long prefabricated bridge unit fabricated in our Easton, NY manufacturing facility was installed by SPS New England (Salisbury, MA) at the MBTA Beverly Station over Pleasant Street in Beverly, MA.