Project Details

  • Owner: Vermont Agency of Transportation
  • Contractor: Kubricky Construction Corp.
  • Specialty Precast Consultant: Eddie He
  • Completion Date: 2019
  • Scope: AccelBridge(tm), Deck Panels, Backwalls, Sleeper Slabs, Approach Slabs

Project Overview

This project featured substructure rehabilitation and deck replacements on four mainline bridges (76North, 76South, 77North, and 77South) on one of the busiest corridors in the most populated county in the state of Vermont. This accelerated bridge construction (ABC) project was delivered through a Construction Manager/General Contractor (CM/GC) contract where the designer, owner, contractor, (and in this case the precast manufacturer) were involved in developing the means and methods of construction. To minimize impact on the traveling public, the Vermont Agency of Transportation (VTrans) allowed for six separate weekend closures to complete the entire project. To support this very aggressive schedule, the team chose a patented and innovative full-depth precast deck system called AccelBridge™. The two 151-ft and two 185-ft span bridges had their decks replaced in only (59) hours during four of the six weekends. The full width AccelBridge™ deck system eliminated costly cast-in-place joints between panels. Cast-in-place joints would have been more time consuming to construct, with a higher likelihood of corrosion. These self-aligning, match-cast units provided VTrans with a durable new deck that is in compression without requiring any post-tensioning. Fort Miller manufactured (58) bridge deck panels (over 23,500-SF), (32) precast approach slabs, (32) precast backwalls, and (8) precast sleeper slabs for this project.

AccelBridge™ being lifted into place with cranes

Resources & Downloads

Access our product resources and downloads for comprehensive information on our offerings.

Featured Bridge Projects

We have participated in some of the most celebrated bridge projects in recent memory, including the Alexander Hamilton Bridge/Highbridge Interchange, the Kosciuszko Bridge over Newtown Creek in Brooklyn-Queens, New York City, and the replacement of the Tappan Zee Bridge over the lower Hudson River.

Elit Veniam Elit Quis Voluptate Commodo

Excepteur esse exercitation aliquip et. Labore dolore aliqua ullamco consectetur ex. Culpa aliqua deserunt duis sint. Ea nisi anim quis labore eu est consectetur elit aliquip nulla consequat nulla ipsum veniam. Dolor in pariatur eiusmod.