Highbridge – The Bronx, NY

Owner: New York State Dept. of Transportation, Region 11

General Contractor: Posillico Civil (Farmingdale, NY)

Precast Concrete Manufacturer: The Fort Miller Co., Inc. (Greenwich, NY)

Engineer of Record: STV, Incorporated

This was the New York State Department of Transportation Design-Build Contract D900039, Region 11 Alexander Hamilton Bridge / Highbridge Interchange. On this very complicated design-build bridge project with a mixture of radial and straight girders, we produced a total of (605) precast concrete deck panels for three ramps in the vicinity of the Major Deegan Expressway / Alexander Hamilton Bridge in Bronx, NYC. Due to varying elevations of the ramps, some of the bridge decks required warped geometry. All bridge deck units were fabricated in Fort Miller’s Easton, NY manufacturing facility and delivered to the site via specialized hauling equipment.

Comments are closed.