County RT 8A

Heath, MA

Project Details

  • Owner: Town of Heath, MA
  • Contractor: J.H. Maxymillian
  • Engineer: Bayside Engineering
  • Completion Date: 2017
  • Scope: 3-Sided Bridge Units, Footings, Approach Slabs, Guiderail

Project Overview

This project consisted of Fort Miller producing a total of (7) 3-sided rigid frame bridge units, (2) precast footings, (6) precast approach slabs, and (4) guiderail transitions for County Route 8A over Mill Brook in the Town of Heath, MA. The bridge units have a 40 ft- span and an 8 ft-6 in rise. Fort Miller utilized a 5,000-PSI high performance concrete mix with dark pigment called “Landmark Grey”. The darker concrete and bright red bridge rail contrast each other nicely on this rural New England road.

Brush curbs with anchorage hardware and approach slabs corbels were cast monolithically with the bridge units. The entire structure was transversely post-tensioned, and received an overlay upon completion.

spaanspan installation

Resources & Downloads

Access our product resources and downloads for comprehensive information on our offerings.

Featured Bridge Projects

We have participated in some of the most celebrated bridge projects in recent memory, including the Alexander Hamilton Bridge/Highbridge Interchange, the Kosciuszko Bridge over Newtown Creek in Brooklyn-Queens, New York City, and the replacement of the Tappan Zee Bridge over the lower Hudson River.

Elit Veniam Elit Quis Voluptate Commodo

Excepteur esse exercitation aliquip et. Labore dolore aliqua ullamco consectetur ex. Culpa aliqua deserunt duis sint. Ea nisi anim quis labore eu est consectetur elit aliquip nulla consequat nulla ipsum veniam. Dolor in pariatur eiusmod.