CR 113 Arch Bridge

Greenwich, NY

Project Details

  • Owner: Washington County, NY
  • Contractor: Kubricky Construction Corp.
  • Design Engineer / Engineer of Record: Greenman-Pedersen, Inc.
  • Completion Date: 2019
  • Scope: Three-Span Arch Bridge

Project Overview

Fort Miller supplied all precast components for the new County Route 113 bridge over the Batten Kill River between Greenwich and Easton, NY. Located just 2-miles from our manufacturing facility, the new bridge replaced the existing 103-year-old three-span arch bridge. The clear span of each arch is approximately 88-ft. The new bridge is comprised of a total of (84) precast units with the heaviest unit weighing as much as 54,000-lbs. Fort Miller is proud to have supplied all of the precast for this unique project.

spaanspan installation

Resources & Downloads

Access our product resources and downloads for comprehensive information on our offerings.

Featured Bridge Projects

We have participated in some of the most celebrated bridge projects in recent memory, including the Alexander Hamilton Bridge/Highbridge Interchange, the Kosciuszko Bridge over Newtown Creek in Brooklyn-Queens, New York City, and the replacement of the Tappan Zee Bridge over the lower Hudson River.

Elit Veniam Elit Quis Voluptate Commodo

Excepteur esse exercitation aliquip et. Labore dolore aliqua ullamco consectetur ex. Culpa aliqua deserunt duis sint. Ea nisi anim quis labore eu est consectetur elit aliquip nulla consequat nulla ipsum veniam. Dolor in pariatur eiusmod.