NYS Thruway – Exit 53 Ramp

Salina, NY

Project Details

  • Owner: New York State Thruway Authority
  • Contractors: Union Concrete and Construction (UCC) and Contour Steel, Inc.
  • Engineer: CHA Consulting and LaBella Associates. Structural
  • Steel Fabricator: STS Steel, Inc.
  • Completion Date: 2021
  • Scope: 90 ft Prefabricated Bridge Unit, Fast-Tracked

Project Overview

The Fort Miller Co., Inc. produced and delivered a 90-ft long x 15-ft wide prefabricated bridge unit (PBU) to Exit 53 of the New York State Thruway (Buffalo, NY). Fabricated in our Greenwich, NY facility, the bridge traveled over 300 miles to its final destination; a bridge ramp over Interstate-90. The existing bridge segment had been heavily damaged a few months earlier. Due to high traffic volumes on the bridge and its vicinity to the mainline Thruway, the removal and replacement had to be completed in a single weekend. Union Concrete and Construction Corporation (UCC) was the general contractor responsible for all activities; including but not limited to closing traffic, removing the 108-ton damaged bridge segment, setting the new 95-ton PBU, and getting traffic open to the public. The bridge was replaced over the course of 44 short hours.

spaanspan installation

Resources & Downloads

Access our product resources and downloads for comprehensive information on our offerings.

Featured Bridge Projects

We have participated in some of the most celebrated bridge projects in recent memory, including the Alexander Hamilton Bridge/Highbridge Interchange, the Kosciuszko Bridge over Newtown Creek in Brooklyn-Queens, New York City, and the replacement of the Tappan Zee Bridge over the lower Hudson River.

Elit Veniam Elit Quis Voluptate Commodo

Excepteur esse exercitation aliquip et. Labore dolore aliqua ullamco consectetur ex. Culpa aliqua deserunt duis sint. Ea nisi anim quis labore eu est consectetur elit aliquip nulla consequat nulla ipsum veniam. Dolor in pariatur eiusmod.