Rt. 9A, Manhattan

Owner: NYS Department of Transportation, Region 11

Contractor: Tully Construction Co, Inc. / E.E. Cruz, J.V.

Project Engineer: Stantec Consulting Services, Inc.

Located just south of Ground Zero along the Henry Hudson Parkway, the area has long been considered one of the major commercial, financial and cultural centers in the world. Fort Miller worked on Rte 9A southbound, which is lined on both sides with a prefabricated architectural barrier. The project also entailed a bike path featuring precast paver panels on either side of the asphalt path. Additional prefabricated architectural walls contain the landscaping between the bike path and the pedestrian walk. While the project is still under construction, over 400 pieces of barrier and landscape wall; and 300 pieces of prefabricated paver panels have been installed to date.