Fort Miller Precast logo; Thank you for your patience while we updating our website

518.695.5000
P.O. Box 98
Schuylerville, NY 12871

U.S. Coast Guard – Shinnecock

Owner: U.S. Coast Guard

Contractor: Chesterfield Associates, Inc. (Westhampton Beach, NY)

Engineer: Haskell Architects & Engineers

On this project, Fort Miller provided (62) precast concrete wharf deck panels with integral curbs and (15) precast concrete pile caps. After all precast elements were assembled, the wharf was/is approximately 177-feet long by 30-feet wide. To connect the deck panels to the pile caps on the underside, each deck panel was produced with voids for the contractor (Chesterfield Associates, Inc.) to field drill into the pile caps. Eventually threaded dowel rods and plate washers were installed. All voids were filled with non-shrink grout.

Comments are closed.