Fort Miller Precast logo; Thank you for your patience while we updating our website

518.695.5000
P.O. Box 98
Schuylerville, NY 12871

Precast Deck Panels used for Critical Thoroughfare in the Bronx (Hunts Point Access)

July 01, 2021

by Josh French  |   in Uncategorized  |   Comments Off on Precast Deck Panels used for Critical Thoroughfare in the Bronx (Hunts Point Access)

This project includes four precast bridge decks on steel girder structures which replace the existing bridges along a compound curve with very limited space. This highway bridge is a critical juncture for commercial truck traffic and had to remain open during construction. The detail shown was generated by our in-house engineering department to meet the load transfer requirements of two separate bridges which are diverging in elevation.  The height differential between bridges varied from 0.5” to 30”, requiring several different details. Additionally, haunches on this bridge varied from 0” to 28.5”. This connection utilized #5 and #6 bar at approximately 2” on center along this compound curve, requiring meticulous planning and precise manufacturing.

Contractor: Skanska-Echo III, HPA Joint Venture