On the night of February 18th 2022, our 53-ft long prefabricated bridge unit fabricated in our Easton, NY manufacturing facility was installed by SPS New England (Salisbury, MA) at the MBTA Beverly Station over Pleasant Street in Beverly, MA.

On the night of February 18th 2022, our 53-ft long prefabricated bridge unit fabricated in our Easton, NY manufacturing facility was installed by SPS New England (Salisbury, MA) at the MBTA Beverly Station over Pleasant Street in Beverly, MA.
