Precast Arch – Granville, NY

Construction of a new Church Street arch bridge over Mettawee River in Granville, NY is well underway! For this project we fabricated (14) half arch units weighing 54,000-lbs/each. When installed, the arch will have a clear span of 94-ft. We also fabricated (12) stone textured headwalls and (25) stone textured wingwall units. The heaviest pieces were the fascia units weighing over 54,000 lbs. The bridge is being installed/constructed by the general contracting team of James H. Maloy, Inc. (Loudonville, NY).

Elit Veniam Elit Quis Voluptate Commodo

Excepteur esse exercitation aliquip et. Labore dolore aliqua ullamco consectetur ex. Culpa aliqua deserunt duis sint. Ea nisi anim quis labore eu est consectetur elit aliquip nulla consequat nulla ipsum veniam. Dolor in pariatur eiusmod.