Fort Miller’s Bridge Decks being installed over Throgs Neck Expressway in the Bronx
Fort Miller’s precast concrete bridge deck panels were recently installed on the Randall Avenue bridge over I-695 (Throgs Neck Expressway)…
Fort Miller’s precast concrete bridge deck panels were recently installed on the Randall Avenue bridge over I-695 (Throgs Neck Expressway)…
Click on the below link to read about this innovative project (Pier55) that Fort Miller is currently working on. We…
Back in November 2016, The Fort Miller Co., Inc. produced and delivered a 90-foot long x 15-foot wide prefabricated bridge…
A total of (4) prefabricated bridge units (PBUs) and (8) precast concrete approach slabs were recently installed on CT Route…
The first of (975) precast concrete bridge deck panels have been installed by Tappan Zee Constructors on the Main Span…