NYS Thruway Authority, Contract “TANE 19-40” Bronx/Westchester Co. Work Order #05, #06 & #07. Project consisted of pavement Repairs from MP NE SB 0.17 – 14.10. Grace Industries, Inc. installed a total of (108) precast concrete Super-Slabs®.
Fort Miller Super-Slabs installed on NYS Thruway
NYS Thruway Authority, Contract “TANE 19-40” Bronx/Westchester Co. Work Order #05, #06 & #07. Project consisted of pavement Repairs from MP NE SB 0.17 – 14.10. Grace Industries, Inc. installed a total of (108) precast concrete Super-Slabs®.



