Fort Miller’s Precast installed on Long Island Rail Road 3rd Track Project

Owner: MTA Long Island Rail Road
Engineer: T.Y. Lin International / Stantec Inc.
Contractor: 3rd Track Constructors

Using a total (440) precast concrete T-WALL® retaining wall units produced by Fort Miller, the Urban Avenue (Town of North Hempstead) & Covert Avenue (Town of New Hyde Park) railroad grade crossings were eliminated and reconstructed to provide two-lane grade separated underpasses with sidewalks. Each retaining wall piece was constructed with an architectural stone finish.

Elit Veniam Elit Quis Voluptate Commodo

Excepteur esse exercitation aliquip et. Labore dolore aliqua ullamco consectetur ex. Culpa aliqua deserunt duis sint. Ea nisi anim quis labore eu est consectetur elit aliquip nulla consequat nulla ipsum veniam. Dolor in pariatur eiusmod.