Randall Ave Bridge Repair

Bronx, NY

Project Details

  • Owner: New York State Department of Transportation
  • Contractor: El Sol Contracting & Construction
  • Completion Date: 2018
  • Scope: 72 Deck Panels, Ultra-High Performance Concrete (UHPC)

Project Overview

Design-Build Project, Contract D900037, New York City.

Fort Miller’s precast concrete bridge deck panels were installed on the Randall Avenue bridge over I-695 (Throgs Neck Expressway) in the Bronx. A total of (72) 10 in. thick panels were cast in Fort Miller’s Greenwich, NY facility and delivered to this site in April 2018. The Randall Avenue site was the first of three bridge sites utilizing our bridge deck panels on this Design-Build Contract with El Sol Contracting & Construction (Maspeth, NY). After all three projects were completed, Fort Miller fabricated and delivered a total of 58,000-SF of precast concrete bridge deck. All joints between the precast deck units were filled with ultra-high performance concrete.

spaanspan installation

Resources & Downloads

Access our product resources and downloads for comprehensive information on our offerings.

Featured Bridge Projects

We have participated in some of the most celebrated bridge projects in recent memory, including the Alexander Hamilton Bridge/Highbridge Interchange, the Kosciuszko Bridge over Newtown Creek in Brooklyn-Queens, New York City, and the replacement of the Tappan Zee Bridge over the lower Hudson River.

Elit Veniam Elit Quis Voluptate Commodo

Excepteur esse exercitation aliquip et. Labore dolore aliqua ullamco consectetur ex. Culpa aliqua deserunt duis sint. Ea nisi anim quis labore eu est consectetur elit aliquip nulla consequat nulla ipsum veniam. Dolor in pariatur eiusmod.